Description
CHC is an optimal solution for pre-compliance emission tests in compliance with IEC/EN 61000-4-3 with 3m testing method. Its characteristic fit best the requirement of radiation emission pre-compliance tests. Installation of ferrite absorbers and hybrid absorbers internally makes the test frequency range range from 30 MHz to 18 GHz at least. Users can choose either the semi anechoic chamber (with ground plane) or the fully anechoic chamber (with floor absorbers). For radiation immunity tests, it’s necessary to lay absorbers on the floor between radiation emission antenna and EUT, so the absorbers are standard accessories when the chamber is delivery.
Standard Configuration
·One access door,938mm x 1,968mm
·2 honeycomb windows used for ventilating
·One 250 V AC mains filter,2*32A
·2 interface panels
· Feed through components:6 N-type connectors,6 BNC connector,2 fiber interfaces
·Electrical equipment
·Lightning equipment
·Elevated floor
·Laying Absorbers
Optional Configuration
·Three-phase mains filter
·Signal and data wire filter
·Fan
·Antenna lifting tower
·Video and audio monitoring system
·Turntable
·Totally non-combustion type wedge absorbers
·Calibration for the performance of chamber
·Measurement devices
·Other additional devices
Reviews
There are no reviews yet.